West Hill Farm 8.69MWp & West Hill Farm Extension 2.39MWp (total 11.08MWp)

West Hill Farm 8.69MWp & West Hill Farm Extension 2.39MWp (total 11.08MWp)

The project is located near West Down. The project was constructed on behalf of EGN Project Limited and was executed in two phases:

  • Phase 1 was executed between April and June 2014 and included the electrical installation of (cabling and connections) of 8 central inverters (ABB 800PVS), 34086 panels(REC 255W), total installed capacity of 8,69MWp on mounting structure by Alumil Hellas
  • Phase 2 was executed during March 2015and included the electrical installation of (cabling and connections) of 2 central inverters (SMA 900CP HT), 9338 panels(REC 255W), total installed capacity of 2,39MWp on mounting structure by Praxia Solar